Projects

Summer 2016- Cavitt Road Area

Updated: September 15, 2016 - 1:12pm

Starting late May, the crew will be installing 2300 feet of ductile iron pipe from Tyrolia to Dolomite, Dolomite to Alpine Village Drive, Alpine Village Drive to Cavitt. This project will continue all summer, and upon completion the roadways will be restored.Read more

Franklin Heights

Updated: May 10, 2016 - 10:29am

On May 5, 2016, final connections will be made to the new 10-inch ductile iron pipe installed between Revere Drive and 423 Franklin Heights. Several houses in the area will be without water between 8:00- 3:00.Read more

Pages