Title | Start Date | Project Status | Body |
---|---|---|---|
North Park Street Waterline Replacement | info coming soon | ||
Alva Way Waterline Replacement | info coming soon | ||
Caruso/Thomas Waterline Replacement | crews to replace waterlines Caruso/Thomas | ||
Williamsburg Road Waterline Replacement | crews to replace waterlines on Williamsburg Road | ||
Winter Season Repairs | Crews are currently repairing yards and roads from the work from the winter season. This should be completed by the end of May. | ||
Hydrant Flushing | We are starting hydrant flushing Monday May 9th and last around 6 weeks. | ||
Garden City Area Sanitary Sewer Rehabilitation Project | The Monroeville Municipal Authority (MMA) is rehabilitating 35,000 linear feet of structurally deficient sanitary sewer in the… | ||
Old William Penn Highway Water Line Replacement | The Monroeville Municipal Authority is replacing 2,000 linear feet of aging 8-inch water line and associates service connections… | ||
Monroeville Road Water Line Replacement | The Monroeville Municipal Authority is replacing 1,300 linear feet of aging 6-inch water line and associated service connections… | ||
Road Restoration: Center Road | Monroeville Municipal Authority contractor will perform road restoration on CENTER ROAD- between Beatty Road and Helmar Drive.… | ||
Elmwood Drive | New Six inch water line on Elmwood Drive- 700 feet. Estimated completion late September 2019 | ||
Noel Drive @ Hochberg | Replacement of 6 inch cast iron water line with 6 inch iron ductile pipeExpected completion April 30, 2019 | ||
Cirbus Lane line replacement | replacing 675 feet of 3 inch cast iron pipe with 6 inch iron ductile pipe. | ||
Center Road Replacement Project (Old William Penn to Ruth Dr) | Replacement of 8 inch cast iron water line. Expected completion July 20, 2019 | ||
2018 Sanitary Sewer Rehabilitation Project | The Monroeville Municipal Authority (MMA) will begin a sanitary sewer rehabilitation project on June 19, 2018. Approximately 40,… | ||
Restore Water Breaks | Restoration from winter water breaks | ||
Center Road waterline replacement | 8 inch waterline replacement on Center Road from My Way to Kenmar | ||
2017 MMA Sewer Lining Rehabilitation Contract | Insight Pipe Contracting, LLC will be cleaning, televising, and relining approximately 8,500 linear feet of 8 to 15-inch diameter… | ||
Tilbrook Road | Water line installation on Tillbrook Road. | ||
Valve replacements- Mosside Blvd @ Daugherty Dr | Replacement of 12 inch valves on Mosside Boulevard at Daugherty Drive. | ||
Water Line Replacement -Rt22 to Kenmar Drive | replacement of an eight inch water line from rte 22 to Kenmar Drive. Estimated project duration: 5 weeks | ||
Feb/March 2017 | Maintenance of Sewers- Garden City AreaLine Replacement Projects- Williamsburg Drive & Tilbrook Road | ||
Franklin Heights | On May 5, 2016, final connections will be made to the new 10-inch ductile iron pipe installed between Revere Drive and 423 … | ||
Summer 2016- Cavitt Road Area | Starting late May, the crew will be installing 2300 feet of ductile iron pipe from Tyrolia to Dolomite, Dolomite to Alpine… |